Italy
Europe · Southern EuropeITA
Member of: EU, NATO, G20, G7.
Research coverage
Score not yet published · scorecard mode
Coverage 3%
2 without data, 27 unchecked
0 events, 0 confirmed. Coverage 3%. Latest event: none.
Categories
| Category | Events |
|---|---|
| A Arms | No events |
| B Diplomacy | No events |
| C Trade | No events |
| D Humanitarian | No events |
| E Accountabilityexperimental · not scored | No events |
Events over time
Data behind this chart
Events
No event and 1 series of computed values, newest first.
1 of 1 shown.
- D1, Humanitarian
Italy paid or committed USD 55.4 million to the oPt flash appeals in the 12 months to 31 August 2026, per FTS.
36 computed values from 2023-10-01 to 2026-10-01.
Dates on which the points changed Date Points Before 2026-08-01 +6 +3 2025-11-01 +3 +1 2025-07-01 +1 +3 2024-07-01 +3 +1 2023-10-01 +1 — Row 1117 of data/structured/fts_funding.csvView the row in the repository - iso3
- ITA
- window_start
- 2025-09-01
- window_end
- 2026-08-31
- usd_paid_committed
- 55369161
- plan_ids
- 1186;1156;1273;1510
- retrieved_at
- 2026-09-27T11:14:55Z
Row 85 of data/structured/gni.csvView the row in the repository - iso3
- ITA
- year
- 2025
- gni_atlas_usd
- 2479102475168
Points: +6
ConfirmedScope: Gaza
Not counted at the build date: ended
Basis: F = USD 55,369,161 (2025-09-01 to 2026-08-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00223% of GNI; tier +6.
9 archived responses
- OCHA FTS API v1 flows, plan 1186, page 1Archived copy
sha256 1f3f…8b2026-09-27
src_20260927_fts_plan-1186-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1186, page 1Archived copy
- OCHA FTS API v1 flows, plan 1156, page 1Archived copy
sha256 aa65…222026-09-27
src_20260927_fts_plan-1156-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1156, page 1Archived copy
- OCHA FTS API v1 flows, plan 1156, page 2Archived copy
sha256 5259…2b2026-09-27
src_20260927_fts_plan-1156-p2 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1156, page 2Archived copy
- OCHA FTS API v1 flows, plan 1273, page 1Archived copy
sha256 5ca8…bd2026-09-27
src_20260927_fts_plan-1273-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1273, page 1Archived copy
- OCHA FTS API v1 flows, plan 1273, page 2Archived copy
sha256 dd6e…a72026-09-27
src_20260927_fts_plan-1273-p2 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1273, page 2Archived copy
- OCHA FTS API v1 flows, plan 1510, page 1Archived copy
sha256 6eb9…9e2026-09-27
src_20260927_fts_plan-1510-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1510, page 1Archived copy
- OCHA FTS API v1 flows, plan 1510, page 2Archived copy
sha256 8732…f42026-09-27
src_20260927_fts_plan-1510-p2 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1510, page 2Archived copy
- OCHA FTS API v1, list of locationsArchived copy
sha256 ab1d…c72026-09-27
src_20260927_fts_locations · retrieved 2026-09-27
- OCHA FTS API v1, list of locationsArchived copy
- World Bank API v2, GNI, Atlas method (current US$) (NY.GNP.ATLS.CD), most recent value per economyArchived copy
sha256 2bd9…cb2026-09-27
src_20260927_worldbank_gni-atlas · retrieved 2026-09-27
- World Bank API v2, GNI, Atlas method (current US$) (NY.GNP.ATLS.CD), most recent value per economyArchived copy
All 36 values
Every value of the series From Until Points Basis Table row 2026-09-01 2026-10-01 +6 F = USD 55,369,161 (2025-09-01 to 2026-08-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00223% of GNI; tier +6. fts_funding.csv:1117gni.csv:85 2026-08-01 2026-09-01 +6 F = USD 55,369,161 (2025-08-01 to 2026-07-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00223% of GNI; tier +6. fts_funding.csv:1116gni.csv:85 2026-07-01 2026-08-01 +3 F = USD 43,914,407 (2025-07-01 to 2026-06-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00177% of GNI; tier +3. fts_funding.csv:1115gni.csv:85 2026-06-01 2026-07-01 +3 F = USD 38,815,139 (2025-06-01 to 2026-05-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00157% of GNI; tier +3. fts_funding.csv:1114gni.csv:85 2026-05-01 2026-06-01 +3 F = USD 40,984,336 (2025-05-01 to 2026-04-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00165% of GNI; tier +3. fts_funding.csv:1113gni.csv:85 2026-04-01 2026-05-01 +3 F = USD 44,217,124 (2025-04-01 to 2026-03-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00178% of GNI; tier +3. fts_funding.csv:1112gni.csv:85 2026-03-01 2026-04-01 +3 F = USD 44,217,124 (2025-03-01 to 2026-02-28, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00178% of GNI; tier +3. fts_funding.csv:1111gni.csv:85 2026-02-01 2026-03-01 +3 F = USD 44,217,124 (2025-02-01 to 2026-01-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00178% of GNI; tier +3. fts_funding.csv:1110gni.csv:85 2026-01-01 2026-02-01 +3 F = USD 40,161,504 (2025-01-01 to 2025-12-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00162% of GNI; tier +3. fts_funding.csv:1109gni.csv:85 2025-12-01 2026-01-01 +3 F = USD 44,542,664 (2024-12-01 to 2025-11-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00180% of GNI; tier +3. fts_funding.csv:1108gni.csv:85 2025-11-01 2025-12-01 +3 F = USD 44,749,653 (2024-11-01 to 2025-10-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00181% of GNI; tier +3. fts_funding.csv:1107gni.csv:85 2025-10-01 2025-11-01 +1 F = USD 9,990,134 (2024-10-01 to 2025-09-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000403% of GNI; tier +1. fts_funding.csv:1106gni.csv:85 2025-09-01 2025-10-01 +1 F = USD 9,990,134 (2024-09-01 to 2025-08-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000403% of GNI; tier +1. fts_funding.csv:1105gni.csv:85 2025-08-01 2025-09-01 +1 F = USD 9,990,134 (2024-08-01 to 2025-07-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000403% of GNI; tier +1. fts_funding.csv:1104gni.csv:85 2025-07-01 2025-08-01 +1 F = USD 10,210,669 (2024-07-01 to 2025-06-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000412% of GNI; tier +1. fts_funding.csv:1103gni.csv:85 2025-06-01 2025-07-01 +3 F = USD 26,455,003 (2024-06-01 to 2025-05-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00107% of GNI; tier +3. fts_funding.csv:1102gni.csv:85 2025-05-01 2025-06-01 +3 F = USD 24,285,806 (2024-05-01 to 2025-04-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000980% of GNI; tier +3. fts_funding.csv:1101gni.csv:85 2025-04-01 2025-05-01 +3 F = USD 21,053,018 (2024-04-01 to 2025-03-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000849% of GNI; tier +3. fts_funding.csv:1100gni.csv:85 2025-03-01 2025-04-01 +3 F = USD 24,693,708 (2024-03-01 to 2025-02-28, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000996% of GNI; tier +3. fts_funding.csv:1099gni.csv:85 2025-02-01 2025-03-01 +3 F = USD 24,693,708 (2024-02-01 to 2025-01-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000996% of GNI; tier +3. fts_funding.csv:1098gni.csv:85 2025-01-01 2025-02-01 +3 F = USD 25,766,669 (2024-01-01 to 2024-12-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00104% of GNI; tier +3. fts_funding.csv:1097gni.csv:85 2024-12-01 2025-01-01 +3 F = USD 28,096,113 (2023-12-01 to 2024-11-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00113% of GNI; tier +3. fts_funding.csv:1096gni.csv:85 2024-11-01 2024-12-01 +3 F = USD 27,889,124 (2023-11-01 to 2024-10-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00112% of GNI; tier +3. fts_funding.csv:1095gni.csv:85 2024-10-01 2024-11-01 +3 F = USD 27,965,426 (2023-10-01 to 2024-09-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00113% of GNI; tier +3. fts_funding.csv:1094gni.csv:85 2024-09-01 2024-10-01 +3 F = USD 27,965,426 (2023-09-01 to 2024-08-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00113% of GNI; tier +3. fts_funding.csv:1093gni.csv:85 2024-08-01 2024-09-01 +3 F = USD 27,965,426 (2023-08-01 to 2024-07-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00113% of GNI; tier +3. fts_funding.csv:1092gni.csv:85 2024-07-01 2024-08-01 +3 F = USD 27,744,891 (2023-07-01 to 2024-06-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.00112% of GNI; tier +3. fts_funding.csv:1091gni.csv:85 2024-06-01 2024-07-01 +1 F = USD 11,500,557 (2023-06-01 to 2024-05-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000464% of GNI; tier +1. fts_funding.csv:1090gni.csv:85 2024-05-01 2024-06-01 +1 F = USD 11,500,557 (2023-05-01 to 2024-04-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000464% of GNI; tier +1. fts_funding.csv:1089gni.csv:85 2024-04-01 2024-05-01 +1 F = USD 11,500,557 (2023-04-01 to 2024-03-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000464% of GNI; tier +1. fts_funding.csv:1088gni.csv:85 2024-03-01 2024-04-01 +1 F = USD 8,409,952 (2023-03-01 to 2024-02-29, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000339% of GNI; tier +1. fts_funding.csv:1087gni.csv:85 2024-02-01 2024-03-01 +1 F = USD 8,409,952 (2023-02-01 to 2024-01-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000339% of GNI; tier +1. fts_funding.csv:1086gni.csv:85 2024-01-01 2024-02-01 +1 F = USD 7,336,991 (2023-01-01 to 2023-12-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.000296% of GNI; tier +1. fts_funding.csv:1085gni.csv:85 2023-12-01 2024-01-01 +1 F = USD 626,387 (2022-12-01 to 2023-11-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.0000253% of GNI; tier +1. fts_funding.csv:1084gni.csv:85 2023-11-01 2023-12-01 +1 F = USD 626,387 (2022-11-01 to 2023-10-31, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.0000253% of GNI; tier +1. fts_funding.csv:1083gni.csv:85 2023-10-01 2023-11-01 +1 F = USD 550,085 (2022-10-01 to 2023-09-30, plans 1186, 1156, 1273, 1510); GNI 2025 = USD 2,479,102,475,168; x = 0.0000222% of GNI; tier +1. fts_funding.csv:1082gni.csv:85 The 36 values cite these archived responses:
9 archived responses
- OCHA FTS API v1 flows, plan 1186, page 1Archived copy
sha256 1f3f…8b2026-09-27
src_20260927_fts_plan-1186-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1186, page 1Archived copy
- OCHA FTS API v1 flows, plan 1156, page 1Archived copy
sha256 aa65…222026-09-27
src_20260927_fts_plan-1156-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1156, page 1Archived copy
- OCHA FTS API v1 flows, plan 1156, page 2Archived copy
sha256 5259…2b2026-09-27
src_20260927_fts_plan-1156-p2 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1156, page 2Archived copy
- OCHA FTS API v1 flows, plan 1273, page 1Archived copy
sha256 5ca8…bd2026-09-27
src_20260927_fts_plan-1273-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1273, page 1Archived copy
- OCHA FTS API v1 flows, plan 1273, page 2Archived copy
sha256 dd6e…a72026-09-27
src_20260927_fts_plan-1273-p2 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1273, page 2Archived copy
- OCHA FTS API v1 flows, plan 1510, page 1Archived copy
sha256 6eb9…9e2026-09-27
src_20260927_fts_plan-1510-p1 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1510, page 1Archived copy
- OCHA FTS API v1 flows, plan 1510, page 2Archived copy
sha256 8732…f42026-09-27
src_20260927_fts_plan-1510-p2 · retrieved 2026-09-27
- OCHA FTS API v1 flows, plan 1510, page 2Archived copy
- OCHA FTS API v1, list of locationsArchived copy
sha256 ab1d…c72026-09-27
src_20260927_fts_locations · retrieved 2026-09-27
- OCHA FTS API v1, list of locationsArchived copy
- World Bank API v2, GNI, Atlas method (current US$) (NY.GNP.ATLS.CD), most recent value per economyArchived copy
sha256 2bd9…cb2026-09-27
src_20260927_worldbank_gni-atlas · retrieved 2026-09-27
- World Bank API v2, GNI, Atlas method (current US$) (NY.GNP.ATLS.CD), most recent value per economyArchived copy
What was checked
No full check recorded yet.
Research status of the 31 scored indicators
| Indicator | Status | Checked | Note |
|---|---|---|---|
| A1 Major conventional arms delivered to Israel, scaled by share of Israel's imports | not checked yet | ||
| A2 Ammunition, components, dual-use military goods exported (HS 93, 8710, 8802, 8526) | no data published | Recorded as “not checked yet”; read from the structured tables: no row for this country. | |
| A3 Participation in the F-35 supply chain | not checked yet | ||
| A4 Arms purchased from Israel (new contracts since Oct 2023) | not checked yet | ||
| A5 Military cooperation: joint exercises, intelligence sharing, basing, weapons transit via ports or airspace | not checked yet | ||
| A6 Export licences suspended (partial) | not checked yet | ||
| A7 Full two-way arms embargo in force | not checked yet | ||
| A8 Transit denied to arms shipments (ports, airspace, flagged vessels) | not checked yet | ||
| B1 UN General Assembly votes on Gaza ceasefire, UNRWA, Palestine status | not checked yet | ||
| B2 UN Security Council veto of a ceasefire resolution (members only) | not applicable | Recorded as “not checked yet”; set by the Security Council rule (docs/02 §8). | |
| B3 ICJ genocide case: declaration of intervention filed | not checked yet | ||
| B4 Formal position rejecting or opposing ICJ provisional measures | not checked yet | ||
| B5 ICC: public commitment to execute arrest warrants | not checked yet | ||
| B6 ICC: stated refusal to execute warrants, or hosting a wanted official | not checked yet | ||
| B7 Sanctions on ICC judges or prosecutors | not checked yet | ||
| B8 Recognition of the State of Palestine after Oct 2023 | not checked yet | ||
| B9 Head of government or foreign minister formally names violations, calls for ceasefire or an end to the blockade | not checked yet | ||
| B10 Head of government declares unconditional support or denies documented violations | not checked yet | ||
| B11 Sanctions on Israeli ministers or settler entities | not checked yet | ||
| B12 Ambassador recalled / relations downgraded / severed | not checked yet | ||
| C1 Trade or association agreement suspended or formally reviewed | not checked yet | ||
| C2 New trade, investment or cooperation agreement signed with Israel since Oct 2023 | not checked yet | ||
| C3 Bilateral trade with Israel continued at or above pre-war level | no data published | Recorded as “not checked yet”; read from the structured tables: no row for this country. | |
| C4 Ban on settlement goods (labelling alone +2) | not checked yet | ||
| C5 Sovereign fund or public pension divestment from named companies | not checked yet | ||
| C6 Public procurement exclusion of implicated companies | not checked yet | ||
| D1 Humanitarian funding to the Gaza response, scaled per capita of GNI | has events | Recorded as “not checked yet”; read from the structured tables: a generated event. | |
| D2 UNRWA funding suspended | not checked yet | ||
| D3 UNRWA funding restored / increased above 2022 level | not checked yet | ||
| D4 Medical evacuations hosted, field hospitals deployed | not checked yet | ||
| D5 Visa or refugee pathway opened for Gazans | not checked yet |
Replies
No reply published for this country. How to submit a right of reply
Cite, share, download
Cite
Cite this page
- APA
- Zouad, M. (2026, November 25). Italy (scorecard) (Methodology version 1.0.0-rc.1) [Data set]. Gaza Accountability Index. https://gaza-accountability-index.pages.dev/en/country/ITA?date=2026-11-25
- Chicago
- Zouad, Mohamed. “Italy (scorecard).” Gaza Accountability Index, methodology v1.0.0-rc.1, November 25, 2026. https://gaza-accountability-index.pages.dev/en/country/ITA?date=2026-11-25.
- Plain
- Gaza Accountability Index, Italy (scorecard), methodology v1.0.0-rc.1, as of 25 November 2026, https://gaza-accountability-index.pages.dev/en/country/ITA?date=2026-11-25
Share
Share this page
Dated link
https://gaza-accountability-index.pages.dev/en/country/ITA?date=2026-11-25
Compare with peers
Same region: Europe
AlbaniaAndorraBosnia and HerzegovinaSpainCompare these countries